Catalogue / Biomass boilers & gasifiers
Biomass-fired steam boiler (water-tube), Max 7 seriesSample
by Ajanta Bio Energy (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ajanta Bio Energy (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Biomass-fired steam boiler (water-tube) from Ajanta, Max 7 series: 5 capacity options between 2 TPH and 50 TPH. Design: multi-fuel capability for local biomass, IBR-approved pressure parts and heat-recovery economiser option. Used by textile and food processing, captive steam supply and biomass power plants. Designed and tested to IBR 1950, IS 2002 and IS 5072. Lead time 10-14 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ajanta
- Model
- AJA-3F4 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months from supply
- Standards
- IBR 1950, IS 2002, IS 5072
- Delivers to
- All India
- GST rate
- 12 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity2 TPHAJA-3F4-01 | Capacity: 2 TPH | 2 nos · 10-14 weeks | on quote |
| Capacity5 TPHAJA-3F4-02 | Capacity: 5 TPH | 2 nos · 10-14 weeks | on quote |
| Capacity10 TPHAJA-3F4-03 | Capacity: 10 TPH | 2 nos · 10-14 weeks | on quote |
| Capacity20 TPHAJA-3F4-04 | Capacity: 20 TPH | 2 nos · 16-24 weeks | on quote |
| Capacity50 TPHAJA-3F4-05 | Capacity: 50 TPH | 2 nos · 16-24 weeks | on quote |
Specifications
| Capacity | 2 TPH to 50 TPH (see variants) |
|---|---|
| Fuel | Bagassemade to order: Wood chips / Rice husk / Agro residue pellets |
| Steam pressure | 67 bar |
| Firing system | Fluidised bed |
| Efficiency | 82% |
| Design code | ASME Sec I |
| Ash handling | Automatic screwmade to order: Manual |
| Emission control | ESPmade to order: Multi-cyclone / Bag filter |
| Fuel feeding | Belt conveyor |
| Control | Basic panel |
| Insulation | Ceramic fibre / mineral wool |