Catalogue / Mobile substations
Containerised mobile substation, Volt 2 seriesSample
by Ajantajyoti Transformers (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ajantajyoti Transformers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 2 range of containerised mobile substation by Ajantajyoti covers 3 transformer rating options (5 MVA to 20 MVA). Key features: pre-wired and tested on a trailer, quick restoration after transformer failure and bay-extension and maintenance outage cover. Used by event power supply, temporary construction power and discom emergency backup. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 30-40 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ajantajyoti
- Model
- AJA-8E3 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 30-40 weeks
- Warranty
- 36 months
- Standards
- IEC 62271-202, IS 2026, IEC 60076
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Transformer rating5 MVAAJA-8E3-01 | Transformer rating: 5 MVA | 5 nos · 30-40 weeks | for verified buyers |
| Transformer rating10 MVAAJA-8E3-02 | Transformer rating: 10 MVA | 5 nos · 30-40 weeks | for verified buyers |
| Transformer rating20 MVAAJA-8E3-03 | Transformer rating: 20 MVA | 5 nos · 30-40 weeks | for verified buyers |
Specifications
| Transformer rating | 5 MVA to 20 MVA (see variants) |
|---|---|
| Primary voltage | 66 kV |
| Secondary voltage | 11 kV |
| Chassis | Skidmade to order: Low-bed trailer / Container |
| Primary switchgear | GIS baymade to order: AIS disconnector and breaker |
| Secondary switchgear | Indoor VCB panel |
| Control and relay | Numerical relays |
| Fire protection | Detection and extinguisher |
| Auxiliary supply | DC battery + DG |
| Transport weight | Up to 45 t |
| Setup time | < 4 hoursmade to order: < 24 hours |
| Grounding | Mobile earthing kit |
| Cable reel | Included |