Catalogue / Mobile substations

No photo yet

Containerised mobile substation, Volt 2 seriesSample

by Ajantajyoti Transformers (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ajantajyoti Transformers (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Volt 2 range of containerised mobile substation by Ajantajyoti covers 3 transformer rating options (5 MVA to 20 MVA). Key features: pre-wired and tested on a trailer, quick restoration after transformer failure and bay-extension and maintenance outage cover. Used by event power supply, temporary construction power and discom emergency backup. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 30-40 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ajantajyoti
Model
AJA-8E3 series
Listing type
Product
Unit
nos
Minimum order
5 nos
Lead time
30-40 weeks
Warranty
36 months
Standards
IEC 62271-202, IS 2026, IEC 60076
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating5 MVAAJA-8E3-01Transformer rating: 5 MVA5 nos · 30-40 weeksfor verified buyers
Transformer rating10 MVAAJA-8E3-02Transformer rating: 10 MVA5 nos · 30-40 weeksfor verified buyers
Transformer rating20 MVAAJA-8E3-03Transformer rating: 20 MVA5 nos · 30-40 weeksfor verified buyers

Specifications

Transformer rating5 MVA to 20 MVA (see variants)
Primary voltage66 kV
Secondary voltage11 kV
ChassisSkidmade to order: Low-bed trailer / Container
Primary switchgearGIS baymade to order: AIS disconnector and breaker
Secondary switchgearIndoor VCB panel
Control and relayNumerical relays
Fire protectionDetection and extinguisher
Auxiliary supplyDC battery + DG
Transport weightUp to 45 t
Setup time< 4 hoursmade to order: < 24 hours
GroundingMobile earthing kit
Cable reelIncluded

BARREL: Bharat Atom Renewable Resources Energy Limited