Catalogue / Hydro turbines (Francis, Kaplan, Pelton)
Francis turbine with runner and guide apparatus, Prime seriesSample
by Akshaymark Hydro Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Akshaymark Hydro Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Akshaymark Prime francis turbine with runner and guide apparatus, offered in 5 turbine output options from 1 MW to 25 MW. Highlights: efficiency guarantee supported by tests, model-tested hydraulic design and stainless steel runner for sediment-laden rivers. Typically used for small hydro projects, run-of-river schemes and renovation and modernisation. Designed and tested to IEC 60193, IEC 60041 and IS 12800. Lead time 10-14 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Akshaymark
- Model
- AKS-755 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 months
- Warranty
- 36 months
- Standards
- IEC 60193, IEC 60041, IS 12800
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine output1 MWAKS-755-01 | Turbine output: 1 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output3 MWAKS-755-02 | Turbine output: 3 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output5 MWAKS-755-03 | Turbine output: 5 MW | 1 nos · 10-14 months | for verified buyers |
| Turbine output10 MWAKS-755-04 | Turbine output: 10 MW | 1 nos · 14-20 months | for verified buyers |
| Turbine output25 MWAKS-755-05 | Turbine output: 25 MW | 1 nos · 14-20 months | for verified buyers |
Specifications
| Turbine output | 1 MW to 25 MW (see variants) |
|---|---|
| Turbine type | Peltonmade to order: Francis / Kaplan / Bulb |
| Net head | 200-800 m |
| Rated speed | 500 rpmmade to order: 375 rpm / 428 rpm / 750 rpm |
| Shaft orientation | Verticalmade to order: Horizontal |
| Runner material | 13Cr-4Ni stainless steel |
| Efficiency at best point | 94%made to order: 91% / 93% |
| Flow range | 3-100 m3/s |
| Wicket gates | Cast steel with oil-free bushes |
| Runaway speed | 2.2 x ratedmade to order: 1.8 x rated |
| Design life | 40 years |