Time-of-day tariff optimisation, Elite seriesSample
by Anantsys Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Anantsys Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Time-of-day tariff optimisation from Anantsys, Elite series: 4 curtailable load options between 0.5 MW and 10 MW. Key features: real-time dashboards, reduced peak demand charges and revenue for flexible loads. Suited to industrial plants with flexible load, cold storage and water pumping and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Anantsys
- Model
- ANA-1A5 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWANA-1A5-01 | Curtailable load: 0.5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load1 MWANA-1A5-02 | Curtailable load: 1 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load5 MWANA-1A5-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load10 MWANA-1A5-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | on quote |
Specifications
| Curtailable load | 0.5 MW to 10 MW (see variants) |
|---|---|
| Programme | Aggregator DR |
| Control | Automated through SCADA |
| Notice | 2 hours |
| Duration per event | 4 hoursmade to order: 1 hour |
| Events per year | 20made to order: 50 / Unlimited |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Monthly savings |
| Contract term | 3 years |