Catalogue / Demand response

No photo yet

Time-of-day tariff optimisation, Elite seriesSample

by Anantsys Energy Markets (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Anantsys Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Time-of-day tariff optimisation from Anantsys, Elite series: 4 curtailable load options between 0.5 MW and 10 MW. Key features: real-time dashboards, reduced peak demand charges and revenue for flexible loads. Suited to industrial plants with flexible load, cold storage and water pumping and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Anantsys
Model
ANA-1A5 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Enrolment 4-8 weeks
Warranty
As per programme terms
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
West India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load0.5 MWANA-1A5-01Curtailable load: 0.5 MW1 MW · Enrolment 4-8 weekson quote
Curtailable load1 MWANA-1A5-02Curtailable load: 1 MW1 MW · Enrolment 4-8 weekson quote
Curtailable load5 MWANA-1A5-03Curtailable load: 5 MW1 MW · Enrolment 4-8 weekson quote
Curtailable load10 MWANA-1A5-04Curtailable load: 10 MW1 MW · Enrolment 4-8 weekson quote

Specifications

Curtailable load0.5 MW to 10 MW (see variants)
ProgrammeAggregator DR
ControlAutomated through SCADA
Notice2 hours
Duration per event4 hoursmade to order: 1 hour
Events per year20made to order: 50 / Unlimited
MeteringExisting metermade to order: Dedicated interval meter
Incentive sharing70:30 customer:aggregatormade to order: 80:20
Baseline method10-day averagemade to order: Regression
ReportingMonthly savings
Contract term3 years

BARREL: Bharat Atom Renewable Resources Energy Limited