Catalogue / Energy audits

No photo yet

Building energy audit, Duo 9 seriesSample

by Anantsys Energy Markets (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Anantsys Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Building energy audit from Anantsys, Duo 9 series: 6 connected load options between 500 kW and 50 MW. Highlights: verification after implementation, payback and ROI ranking and statutory forms and BEE reporting. Suited to commercial buildings, hospitals and hotels and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Anantsys
Model
ANA-D71 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load500 kWANA-D71-01Connected load: 500 kW1 site · Audit in 1-2 weekson quote
Connected load1 MWANA-D71-02Connected load: 1 MW1 site · Audit in 1-2 weekson quote
Connected load5 MWANA-D71-03Connected load: 5 MW1 site · Audit in 1-2 weekson quote
Connected load10 MWANA-D71-04Connected load: 10 MW1 site · Audit in 1-2 weekson quote
Connected load25 MWANA-D71-05Connected load: 25 MW1 site · Report in 2-4 weekson quote
Connected load50 MWANA-D71-06Connected load: 50 MW1 site · Report in 2-4 weekson quote

Specifications

Connected load500 kW to 50 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsUltrasonic flow meter, lux metermade to order: Power analyser, thermal camera
AuditorCertified Energy Manager
ReportSavings opportunities with payback
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration7 daysmade to order: 3 days / 14 days
CoverageElectrical and thermal
StatutoryPAT scheme Form-A
DeliverableReport and presentation
Follow-upNot includedmade to order: Verification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited