Demand response programme enrolment, Ultra 3 seriesSample
by Aravali Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Aravali Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra 3 service of demand response programme enrolment by Aravali covers 4 curtailable load options (5 MW to 50 MW). Design: real-time dashboards, settlement transparency and integration with plant process limits. Typically used for industrial plants with flexible load, cold storage and water pumping and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Aravali
- Model
- ARA-B89 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load5 MWARA-B89-01 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load10 MWARA-B89-02 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load25 MWARA-B89-03 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load50 MWARA-B89-04 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | on quote |
Specifications
| Curtailable load | 5 MW to 50 MW (see variants) |
|---|---|
| Programme | TOD optimisationmade to order: Utility DR / Aggregator DR |
| Control | Automated through SCADAmade to order: Manual |
| Notice | 2 hours |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | Unlimitedmade to order: 20 / 50 |
| Metering | Dedicated interval meter |
| Incentive sharing | 80:20made to order: 70:30 customer:aggregator |
| Baseline method | Regression |
| Reporting | Monthly savings |
| Contract term | 3 years |