Catalogue / Demand response

No photo yet

Demand response programme enrolment, Plus 2 seriesSample

by Aravali Energy Markets (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Aravali Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Plus 2 service of demand response programme enrolment by Aravali covers 4 curtailable load options (0.5 MW to 10 MW). Highlights: integration with plant process limits, real-time dashboards and settlement transparency. Suited to cold storage and water pumping, commercial buildings and industrial plants with flexible load. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Aravali
Model
ARA-B81 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Enrolment 4-8 weeks
Warranty
Performance reporting
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load0.5 MWARA-B81-01Curtailable load: 0.5 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load1 MWARA-B81-02Curtailable load: 1 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load5 MWARA-B81-03Curtailable load: 5 MW1 MW · Enrolment 4-8 weeksfor verified buyers
Curtailable load10 MWARA-B81-04Curtailable load: 10 MW1 MW · Enrolment 4-8 weeksfor verified buyers

Specifications

Curtailable load0.5 MW to 10 MW (see variants)
ProgrammeUtility DRmade to order: Aggregator DR / TOD optimisation
ControlManual
Notice15 minutes
Duration per event4 hours
Events per year20
MeteringDedicated interval meter
Incentive sharing80:20
Baseline methodRegressionmade to order: 10-day average
ReportingEvent report
Contract term1 year

BARREL: Bharat Atom Renewable Resources Energy Limited