Mandatory energy audit for designated consumers, Pro seriesSample
by Aravali Energy Markets (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Aravali Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mandatory energy audit for designated consumers from Aravali, Pro series: 5 connected load options between 100 kW and 10 MW. Design: power factor and harmonics assessment, savings quantified with measured data and payback and ROI ranking. Suited to commercial buildings, PAT designated consumers and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Aravali
- Model
- ARA-A78 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWARA-A78-01 | Connected load: 100 kW | 1 site · Audit in 1-2 weeks | for verified buyers |
| Connected load500 kWARA-A78-02 | Connected load: 500 kW | 1 site · Audit in 1-2 weeks | for verified buyers |
| Connected load1 MWARA-A78-03 | Connected load: 1 MW | 1 site · Audit in 1-2 weeks | for verified buyers |
| Connected load5 MWARA-A78-04 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWARA-A78-05 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 100 kW to 10 MW (see variants) |
|---|---|
| Audit level | Investment-grade auditmade to order: Walk-through / Detailed audit |
| Instruments | Power analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter |
| Auditor | BEE accredited energy auditormade to order: Certified Energy Manager |
| Report | Savings opportunities with payback |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 3 days |
| Coverage | Utilities |
| Statutory | Form-1 and Form-2 filing |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Verification after implementationmade to order: Not included |