Catalogue / Energy audits

No photo yet

Mandatory energy audit for designated consumers, Edge seriesSample

by Aravali Energy Markets (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Aravali Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Aravali Edge mandatory energy audit for designated consumers, offered in 6 connected load options from 100 kW to 25 MW. Design: solar and efficiency retrofit options, payback and ROI ranking and verification after implementation. Typically used for industrial plants, commercial buildings and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Aravali
Model
ARA-A78 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 2-4 weeks
Warranty
Clarifications for 6 months
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load100 kWARA-A78-01Connected load: 100 kW1 site · Report in 2-4 weekson quote
Connected load500 kWARA-A78-02Connected load: 500 kW1 site · Report in 2-4 weekson quote
Connected load1 MWARA-A78-03Connected load: 1 MW1 site · Report in 2-4 weekson quote
Connected load5 MWARA-A78-04Connected load: 5 MW1 site · Report in 2-4 weekson quote
Connected load10 MWARA-A78-05Connected load: 10 MW1 site · Report in 2-4 weekson quote
Connected load25 MWARA-A78-06Connected load: 25 MW1 site · Report in 2-4 weekson quote

Specifications

Connected load100 kW to 25 MW (see variants)
Audit levelInvestment-grade auditmade to order: Walk-through / Detailed audit
InstrumentsUltrasonic flow meter, lux meter
AuditorCertified Energy Manager
ReportImplementation roadmap
Baseline12-month bills analysismade to order: Measured baseline
Measurement duration7 days
CoverageElectricalmade to order: Electrical and thermal / Utilities
StatutoryForm-1 and Form-2 filingmade to order: PAT scheme Form-A
DeliverableReport and monitoring plan
Follow-upNot included

BARREL: Bharat Atom Renewable Resources Energy Limited