Mandatory energy audit for designated consumers, Edge seriesSample
by Aravali Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Aravali Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Aravali Edge mandatory energy audit for designated consumers, offered in 6 connected load options from 100 kW to 25 MW. Design: solar and efficiency retrofit options, payback and ROI ranking and verification after implementation. Typically used for industrial plants, commercial buildings and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Aravali
- Model
- ARA-A78 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWARA-A78-01 | Connected load: 100 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load500 kWARA-A78-02 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load1 MWARA-A78-03 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load5 MWARA-A78-04 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load10 MWARA-A78-05 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load25 MWARA-A78-06 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 100 kW to 25 MW (see variants) |
|---|---|
| Audit level | Investment-grade auditmade to order: Walk-through / Detailed audit |
| Instruments | Ultrasonic flow meter, lux meter |
| Auditor | Certified Energy Manager |
| Report | Implementation roadmap |
| Baseline | 12-month bills analysismade to order: Measured baseline |
| Measurement duration | 7 days |
| Coverage | Electricalmade to order: Electrical and thermal / Utilities |
| Statutory | Form-1 and Form-2 filingmade to order: PAT scheme Form-A |
| Deliverable | Report and monitoring plan |
| Follow-up | Not included |