Catalogue / Solar module recycling
Certified recycling with EPR compliance, Plus seriesSample
by Aravaliflux Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Aravaliflux Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Aravaliflux Plus certified recycling with EPR compliance, offered in 3 quantity options from 10 tonnes to 100 tonnes. Design: certificate of recycling for compliance, traceable chain of custody and collection logistics included. Typically used for solar plant owners with repowering, module manufacturers and EPC contractors. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Pick-up in 7-14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Aravaliflux
- Model
- ARA-926 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Pick-up in 7-14 days
- Warranty
- As per authorisation
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity10 tonnesARA-926-01 | Quantity: 10 tonnes | 1 tonne · Pick-up in 7-14 days | for verified buyers |
| Quantity50 tonnesARA-926-02 | Quantity: 50 tonnes | 1 tonne · Pick-up in 7-14 days | for verified buyers |
| Quantity100 tonnesARA-926-03 | Quantity: 100 tonnes | 1 tonne · Pick-up in 7-14 days | for verified buyers |
Specifications
| Quantity | 10 tonnes to 100 tonnes (see variants) |
|---|---|
| Process | Thermal and chemical recoverymade to order: Mechanical separation / Reuse testing |
| Recovery rate | 90%+made to order: 85% |
| Materials recovered | Glass, aluminium frame, copper |
| Authorisation | Authorised under E-waste Rulesmade to order: Registered recycler |
| Collection | Pick-up arrangedmade to order: Client delivers |
| Certificate | Recycling certificate |
| Data | Weight and material reportmade to order: Traceability records |
| Turnaround | 2-4 weeks |
| Hazard handling | Broken-glass safe handlingmade to order: Lead and cadmium controls |
| Pricing basis | Per tonnemade to order: Net of recovered value |