Catalogue / Solar module recycling
End-of-life solar module recycling, Edge seriesSample
by Aravaliflux Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Aravaliflux Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Edge service of end-of-life solar module recycling by Aravaliflux covers 3 quantity options (100 tonnes to 1000 tonnes). Highlights: collection logistics included, authorised recycling facility and high material recovery rate. Typically used for EPC contractors, solar plant owners with repowering and rooftop owners. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Pick-up in 7-14 days; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Aravaliflux
- Model
- ARA-919 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Pick-up in 7-14 days
- Warranty
- As per authorisation
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity100 tonnesARA-919-01 | Quantity: 100 tonnes | 1 tonne · Pick-up in 7-14 days | for verified buyers |
| Quantity500 tonnesARA-919-02 | Quantity: 500 tonnes | 1 tonne · Pick-up in 7-14 days | for verified buyers |
| Quantity1000 tonnesARA-919-03 | Quantity: 1000 tonnes | 1 tonne · Pick-up in 7-14 days | for verified buyers |
Specifications
| Quantity | 100 tonnes to 1000 tonnes (see variants) |
|---|---|
| Process | Reuse testingmade to order: Mechanical separation / Thermal and chemical recovery |
| Recovery rate | 85% |
| Materials recovered | Silicon, silvermade to order: Glass, aluminium frame, copper |
| Authorisation | Authorised under E-waste Rules |
| Collection | Client delivers |
| Certificate | Recycling certificate |
| Data | Weight and material reportmade to order: Traceability records |
| Turnaround | 1-2 months |
| Hazard handling | Broken-glass safe handling |
| Pricing basis | Net of recovered value |