Catalogue / Pile drivers & augers

No photo yet

Hydraulic pile driver for solar piles, Smart seriesSample

by Aravali Machinery Rentals (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Aravali Machinery Rentals (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Hydraulic pile driver for solar piles from Aravali, Smart series: 3 rig capacity options between Light solar pile driver and Rotary rig 100 kNm. Highlights: rig inspected before dispatch, depth and verticality control and GPS positioning for solar pile layout. Used by substation pile foundations, solar mounting structure piling and wind turbine foundation works. Designed and tested to IS 2911, IS 4091 and IS 14893. Lead time 3-5 days; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Aravali
Model
ARA-064 series
Listing type
For rent
Unit
nos
Minimum order
1 nos
Lead time
3-5 days
Warranty
Standby machine on request
Standards
IS 2911, IS 4091, IS 14893
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Door delivery in metro cities
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rig capacityLight solar pile driverARA-064-01Rig capacity: Light solar pile driver1 nos · 3-5 daysfor verified buyers
Rig capacityHydraulic hammer 3 tARA-064-02Rig capacity: Hydraulic hammer 3 t1 nos · 3-5 daysfor verified buyers
Rig capacityRotary rig 100 kNmARA-064-03Rig capacity: Rotary rig 100 kNm1 nos · 3-5 daysfor verified buyers

Specifications

Rig capacityLight solar pile driver to Rotary rig 100 kNm (see variants)
Pile diameterUp to 1500 mm
Depth capacity50 mmade to order: 3 m / 30 m
OperatorIncludedmade to order: Not included
CrewOperator + 2 helpersmade to order: Full piling crew
FuelClient scope
AccessoriesAugers, bucketsmade to order: Casing
Minimum hire1 monthmade to order: 15 days
MobilisationLow-bed to site
PositioningManualmade to order: GPS guided
BillingPer monthmade to order: Per day

BARREL: Bharat Atom Renewable Resources Energy Limited