Catalogue / Civil & foundation works
Site roads, drainage and boundary wall, Plus seriesSample
by Arcmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Site roads, drainage and boundary wall from Arcmark, Plus series: 3 works volume options between 10 MW equivalent and 50 MW equivalent. Highlights: monsoon-ready drainage planning, daily quantity and progress log and cube and pile test records. Suited to industrial plants, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmark
- Model
- ARC-5E1 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume10 MW equivalentARC-5E1-01 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentARC-5E1-02 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume50 MW equivalentARC-5E1-03 | Works volume: 50 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
Specifications
| Works volume | 10 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | Driven steel pile |
| Concrete grade | M40 for turbine foundation |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550D |
| Roads and drainage | WBM road with culvertsmade to order: Murram road, 4 m wide / Not included |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | NABL lab testing of materialsmade to order: Cube test reports per pour |
| Machinery | Batching plant at site |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Item rate with retention |