Catalogue / Cabling, trenching & HDD works
Cable trenching and laying for power and control cables, Ultra 7 seriesSample
by Arcmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Arcmark Ultra 7 cable trenching and laying for power and control cables, offered in 5 cable route length options from 2 km to 50 km. Design: warning tape and marker installation, dewatering in high water table and utility locating before excavation. Suited to railway and highway crossings, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmark
- Model
- ARC-B52 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmARC-B52-01 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmARC-B52-02 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmARC-B52-03 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmARC-B52-04 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmARC-B52-05 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 2 km to 50 km (see variants) |
|---|---|
| Method | Trenchless HDD |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.2 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Premouldedmade to order: Heat shrink / Cold shrink |
| Restoration | Road and footpath restorationmade to order: Backfill and compaction only |
| Permissions | Client arrangesmade to order: Contractor arranges road cut approvals |
| Testing | Insulation and VLF test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | HDD crew of 8 with rigmade to order: Trenching team of 15 |