Catalogue / Cabling, trenching & HDD works

No photo yet

Cable trenching and laying for power and control cables, Ultra 7 seriesSample

by Arcmark Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Arcmark Ultra 7 cable trenching and laying for power and control cables, offered in 5 cable route length options from 2 km to 50 km. Design: warning tape and marker installation, dewatering in high water table and utility locating before excavation. Suited to railway and highway crossings, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Arcmark
Model
ARC-B52 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Mobilisation in 7 days
Warranty
Restoration warranty 6 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length2 kmARC-B52-01Cable route length: 2 km1 km · Mobilisation in 7 dayson quote
Cable route length5 kmARC-B52-02Cable route length: 5 km1 km · Mobilisation in 7 dayson quote
Cable route length10 kmARC-B52-03Cable route length: 10 km1 km · Mobilisation in 7 dayson quote
Cable route length20 kmARC-B52-04Cable route length: 20 km1 km · Permits may extend timelineon quote
Cable route length50 kmARC-B52-05Cable route length: 50 km1 km · Permits may extend timelineon quote

Specifications

Cable route length2 km to 50 km (see variants)
MethodTrenchless HDD
HDD capacityUp to 250 mm bore
Trench depth1.2 m
Cable type11/33 kV XLPE
JointingPremouldedmade to order: Heat shrink / Cold shrink
RestorationRoad and footpath restorationmade to order: Backfill and compaction only
PermissionsClient arrangesmade to order: Contractor arranges road cut approvals
TestingInsulation and VLF test
Productivity50 m per day HDDmade to order: 300 m per day open trench
CrewHDD crew of 8 with rigmade to order: Trenching team of 15

BARREL: Bharat Atom Renewable Resources Energy Limited