Catalogue / Installation & erection
Turbine tower and nacelle erection support, Edge 8 seriesSample
by Arcmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge 8 service of turbine tower and nacelle erection support by Arcmark covers 6 installation scope options (1 MW to 100 MW). Key features: material reconciliation reports, torque-verified structure and module fixing and module handling to avoid micro-cracks. Suited to utility solar parks, hybrid projects and wind farm substations. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmark
- Model
- ARC-C48 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWARC-C48-01 | Installation scope: 1 MW | 1 MW · Phased by block | on quote |
| Installation scope5 MWARC-C48-02 | Installation scope: 5 MW | 1 MW · Phased by block | on quote |
| Installation scope10 MWARC-C48-03 | Installation scope: 10 MW | 1 MW · Phased by block | on quote |
| Installation scope25 MWARC-C48-04 | Installation scope: 25 MW | 1 MW · Phased by block | on quote |
| Installation scope50 MWARC-C48-05 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWARC-C48-06 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Complete mechanical and electrical erection |
| Manpower deployed | 60 technicians plus supervisors |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Own cranes and erection toolsmade to order: Pile driver, crane, telehandler |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA |
| Licence | Class A contractor registrationmade to order: Electrical contractor licence |
| Insurance | CAR, WC and third-party liabilitymade to order: CAR and workmen compensation |
| Reporting | Weekly report with look-ahead planmade to order: Daily progress report |
| Payment terms | Monthly running billsmade to order: Milestone based with 10% retention |