Catalogue / Grid connectivity & GNA applications

No photo yet

Connectivity application to STU, Eco seriesSample

by Arcmark Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Eco service of connectivity application to STU by Arcmark covers 6 capacity applied options (10 MW to 1000 MW). Design: preparation of mandatory technical details, support for relinquishment and transfer and bank guarantee timeline tracking. Used by green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Arcmark
Model
ARC-668 series
Listing type
Service
Unit
application
Minimum order
1 application
Lead time
Grant 3-9 months
Warranty
Rework of deficient applications
Standards
CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Capacity applied10 MWARC-668-01Capacity applied: 10 MW1 application · Grant 3-9 monthson quote
Capacity applied50 MWARC-668-02Capacity applied: 50 MW1 application · Grant 3-9 monthson quote
Capacity applied100 MWARC-668-03Capacity applied: 100 MW1 application · Grant 3-9 monthson quote
Capacity applied250 MWARC-668-04Capacity applied: 250 MW1 application · Grant 3-9 monthson quote
Capacity applied500 MWARC-668-05Capacity applied: 500 MW1 application · Grant 3-9 monthson quote
Capacity applied1000 MWARC-668-06Capacity applied: 1000 MW1 application · Grant 3-9 monthson quote

Specifications

Capacity applied10 MW to 1000 MW (see variants)
ApplicationGNAmade to order: Connectivity / Both
ScopeDocument preparation and filingmade to order: End-to-end liaison
Bank guaranteeArranged through partner bank
StudiesGrid impact summarymade to order: Detailed power system study
Portal handlingSTU portal
TeamDedicated managermade to order: Regulatory lead and engineer
TimelineApproval 3-6 monthsmade to order: Filing in 2 weeks
Technical documentsSwitchyard layout and GA drawings
QueriesUntil grantmade to order: Responded within 2 days
Fee basisFixed plus successmade to order: Fixed

BARREL: Bharat Atom Renewable Resources Energy Limited