Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Eco seriesSample
by Arcmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Eco service of connectivity application to STU by Arcmark covers 6 capacity applied options (10 MW to 1000 MW). Design: preparation of mandatory technical details, support for relinquishment and transfer and bank guarantee timeline tracking. Used by green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmark
- Model
- ARC-668 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWARC-668-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied50 MWARC-668-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWARC-668-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWARC-668-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWARC-668-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied1000 MWARC-668-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | GNAmade to order: Connectivity / Both |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged through partner bank |
| Studies | Grid impact summarymade to order: Detailed power system study |
| Portal handling | STU portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed plus successmade to order: Fixed |