Catalogue / Engineering & design

No photo yet

Basic and detailed engineering for wind farms, Core 2 seriesSample

by Arcmark Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Arcmark Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Basic and detailed engineering for wind farms from Arcmark, Core 2 series: 3 plant capacity options between 25 MW and 100 MW. Highlights: layout optimisation for land and shading, yield and loss modelling aligned to bankable reports and cable sizing and voltage drop calculations. Used by captive and C&I solar owners, EPC contractors bidding for projects and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Arcmark
Model
ARC-006 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
3-4 weeks
Warranty
As per contract
Standards
CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity25 MWARC-006-01Plant capacity: 25 MW1 job · 3-4 weekson quote
Plant capacity50 MWARC-006-02Plant capacity: 50 MW1 job · 3-4 weekson quote
Plant capacity100 MWARC-006-03Plant capacity: 100 MW1 job · 3-4 weekson quote

Specifications

Plant capacity25 MW to 100 MW (see variants)
DeliverablesDesign basis report plus drawingsmade to order: GA drawings, SLD, BoQ / Full IFC drawing set with calculations
Design softwarePVsyst, AutoCAD, ETAPmade to order: PVsyst, STAAD, ETAP, Civil 3D
TeamLead engineer plus 3 designersmade to order: Electrical, civil and SCADA discipline leads
Turnaround6-8 weeks
Revisions includedUnlimited until approval
Authority submission supportNonemade to order: CEA/CEIG drawing approval / DISCOM/STU drawing approval
Earthing and LA studyOptional add-onmade to order: Included
FormatPDF and native CADmade to order: PDF, CAD and BIM model
Site visitOne visit includedmade to order: Two visits included / Desk design only
Payment milestones30% advance, 40% on drafts, 30% on IFC

BARREL: Bharat Atom Renewable Resources Energy Limited