Catalogue / Water testing laboratories
Ground water assessment, Prime 7 seriesSample
by Arcmax Water Technologies (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmax Water Technologies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Ground water assessment from Arcmax, Prime 7 series: 6 parameter panel options between Basic 10 parameters and Complete 60+ parameters. Design: fast track report option, sample retention for query period and trained sample collection team. Typically used for solar plant cleaning water, township water quality and statutory consent compliance. Delivered in line with IS 3025, IS 10500 and ISO/IEC 17025. Mobilisation 3-5 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmax
- Model
- ARC-458 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-5 days
- Warranty
- Free re-test on lab error
- Standards
- IS 3025, IS 10500, ISO/IEC 17025
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Parameter panelBasic 10 parametersARC-458-01 | Parameter panel: Basic 10 parameters | 1 job · 3-5 days | for verified buyers |
| Parameter panelPhysical and chemical 25ARC-458-02 | Parameter panel: Physical and chemical 25 | 1 job · 3-5 days | for verified buyers |
| Parameter panelFull IS 10500ARC-458-03 | Parameter panel: Full IS 10500 | 1 job · 3-5 days | for verified buyers |
| Parameter panelHeavy metals panelARC-458-04 | Parameter panel: Heavy metals panel | 1 job · 3-5 days | for verified buyers |
| Parameter panelEffluent CPCB panelARC-458-05 | Parameter panel: Effluent CPCB panel | 1 job · 7-10 days | for verified buyers |
| Parameter panelComplete 60+ parametersARC-458-06 | Parameter panel: Complete 60+ parameters | 1 job · 7-10 days | for verified buyers |
Specifications
| Parameter panel | Basic 10 parameters to Complete 60+ parameters (see variants) |
|---|---|
| Sample type | Cooling water |
| Reporting | Digital reportmade to order: Hard copy with seal |
| Accreditation | NABL accredited |
| Turnaround | 10 daysmade to order: 3 days / 7 days |
| Sample volume | 2 litremade to order: 5 litre |
| Collection | Client collectedmade to order: Lab collected |
| Methods | IS 3025 |
| Sample transport | Chilledmade to order: Ambient |
| Report format | CPCB compliancemade to order: IS 10500 comparison |