Catalogue / Effluent & sewage treatment (ETP / STP)
Effluent treatment plant, Duo seriesSample
by Arcmax Water Technologies (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmax Water Technologies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Arcmax Duo effluent treatment plant, offered in 4 capacity options from 10 KLD to 100 KLD. Key features: screen chamber and equalisation tank, odour control through aeration and low power consumption design. Suited to power plant townships, industrial campus and manufacturing units. Designed and tested to IS 3025, CPCB discharge norms and IS 2470. Lead time 8-12 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmax
- Model
- ARC-2B4 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 10 set
- Lead time
- 8-12 weeks
- Warranty
- 12 months from commissioning
- Standards
- IS 3025, CPCB discharge norms, IS 2470
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity10 KLDARC-2B4-01 | Capacity: 10 KLD | 10 set · 8-12 weeks | for verified buyers |
| Capacity25 KLDARC-2B4-02 | Capacity: 25 KLD | 10 set · 8-12 weeks | for verified buyers |
| Capacity50 KLDARC-2B4-03 | Capacity: 50 KLD | 10 set · 8-12 weeks | for verified buyers |
| Capacity100 KLDARC-2B4-04 | Capacity: 100 KLD | 10 set · 8-12 weeks | for verified buyers |
Specifications
| Capacity | 10 KLD to 100 KLD (see variants) |
|---|---|
| Process | MBR |
| Tank material | RCCmade to order: MS epoxy coated / FRP |
| Treated BOD | Below 20 mg/lmade to order: Below 10 mg/l / Below 30 mg/l |
| Blower | Twin lobemade to order: Ring blower |
| Sludge handling | Screw press |
| Control | Automatic PLC |
| Disinfection | Chlorine dosingmade to order: UV |
| Treated use | Cooling tower makeup |
| Pumps | Submersiblemade to order: Dry mounted |