Catalogue / Water testing laboratories
Transformer coolant and make-up water test, Edge seriesSample
by Arcmax Water Technologies (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Arcmax Water Technologies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Arcmax Edge transformer coolant and make-up water test, offered in 4 parameter panel options from Physical and chemical 25 to Effluent CPCB panel. Highlights: report compared with IS limits, NABL accredited laboratory and sample retention for query period. Typically used for solar plant cleaning water, statutory consent compliance and power plant water chemistry. Delivered in line with IS 3025, IS 10500 and ISO/IEC 17025. Mobilisation 3-5 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Arcmax
- Model
- ARC-302 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-5 days
- Warranty
- Report valid for the sampled lot
- Standards
- IS 3025, IS 10500, ISO/IEC 17025
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Parameter panelPhysical and chemical 25ARC-302-01 | Parameter panel: Physical and chemical 25 | 1 job · 3-5 days | for verified buyers |
| Parameter panelFull IS 10500ARC-302-02 | Parameter panel: Full IS 10500 | 1 job · 3-5 days | for verified buyers |
| Parameter panelHeavy metals panelARC-302-03 | Parameter panel: Heavy metals panel | 1 job · 7-10 days | for verified buyers |
| Parameter panelEffluent CPCB panelARC-302-04 | Parameter panel: Effluent CPCB panel | 1 job · 7-10 days | for verified buyers |
Specifications
| Parameter panel | Physical and chemical 25 to Effluent CPCB panel (see variants) |
|---|---|
| Sample type | Cooling water |
| Reporting | Hard copy with sealmade to order: Digital report |
| Accreditation | NABL accredited |
| Turnaround | 7 daysmade to order: 3 days / 10 days |
| Sample volume | 2 litre |
| Collection | Lab collected |
| Methods | IS 3025made to order: APHA |
| Sample transport | Chilled |
| Report format | CPCB compliancemade to order: IS 10500 comparison |