Catalogue / Furnace & rectifier transformers
Electric arc furnace transformer, Pro seriesSample
by Awadhakshay Transformers (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Awadhakshay Transformers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Electric arc furnace transformer from Awadhakshay, Pro series: 3 rating options between 2 MVA and 10 MVA. Key features: high current LV bus design, low stray flux heating and withstands frequent short-circuit duty. Typically used for aluminium smelters, chlor-alkali and steel melting shops. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 16-20 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Awadhakshay
- Model
- AWA-2B5 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 16-20 weeks
- Warranty
- 24 months
- Standards
- IS 2026, IEC 60076, IEC 61378-1
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating2 MVAAWA-2B5-01 | Rating: 2 MVA | 5 nos · 16-20 weeks | on quote |
| Rating5 MVAAWA-2B5-02 | Rating: 5 MVA | 5 nos · 16-20 weeks | on quote |
| Rating10 MVAAWA-2B5-03 | Rating: 10 MVA | 5 nos · 16-20 weeks | on quote |
Specifications
| Rating | 2 MVA to 10 MVA (see variants) |
|---|---|
| Primary voltage | 66 kV |
| Secondary voltage | Up to 400 V DC rectifiedmade to order: Up to 1000 V |
| Application | Rectifier |
| Cooling | OFAF |
| Tap changer | Off-circuitmade to order: OLTC |
| Secondary taps | Up to 21 steps |
| Vector group | Dy11made to order: Dd0 |
| Overload | 20% for 2 hours |
| Impedance | 8%made to order: 6% |
| Reactor | In-builtmade to order: External |
| Bushings | High-current plate type |
| Monitoring | Online DGA optional |