Catalogue / Solar module recycling
Glass, aluminium and silicon recovery, Elite seriesSample
by Beasphase Advisory (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Beasphase Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Beasphase Elite glass, aluminium and silicon recovery, offered in 3 quantity options from 1 tonne to 10 tonnes. Key features: reuse screening for good modules, authorised recycling facility and collection logistics included. Used by module manufacturers, solar plant owners with repowering and EPC contractors. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Processing 2-8 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Beasphase
- Model
- BEA-F14 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Processing 2-8 weeks
- Warranty
- As per authorisation
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity1 tonneBEA-F14-01 | Quantity: 1 tonne | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity5 tonnesBEA-F14-02 | Quantity: 5 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity10 tonnesBEA-F14-03 | Quantity: 10 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 1 tonne to 10 tonnes (see variants) |
|---|---|
| Process | Thermal and chemical recoverymade to order: Mechanical separation / Reuse testing |
| Recovery rate | 85% |
| Materials recovered | Silicon, silvermade to order: Glass, aluminium frame, copper |
| Authorisation | Registered recyclermade to order: Authorised under E-waste Rules |
| Collection | Client delivers |
| Certificate | Recycling certificate |
| Data | Weight and material report |
| Turnaround | 2-4 weeks |
| Hazard handling | Lead and cadmium controlsmade to order: Broken-glass safe handling |
| Pricing basis | Net of recovered value |