Automated demand response controller, Eco seriesSample
by Beasphase Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Beasphase Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Automated demand response controller from Beasphase, Eco series: 5 curtailable load options between 1 MW and 50 MW. Key features: support for grid operators, integration with plant process limits and revenue for flexible loads. Used by commercial buildings, industrial plants with flexible load and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Beasphase
- Model
- BEA-C41 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load1 MWBEA-C41-01 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWBEA-C41-02 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWBEA-C41-03 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWBEA-C41-04 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWBEA-C41-05 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 1 MW to 50 MW (see variants) |
|---|---|
| Programme | Utility DR |
| Control | Automated through SCADA |
| Notice | 15 minutesmade to order: Day ahead / 2 hours |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | 20 |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Monthly savings |
| Contract term | 3 yearsmade to order: 1 year |