Catalogue / Energy audits

No photo yet

Building energy audit, Pro seriesSample

by Beasphase Advisory (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Beasphase Advisory (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Pro service of building energy audit by Beasphase covers 5 connected load options (1 MW to 50 MW). Design: verification after implementation, payback and ROI ranking and savings quantified with measured data. Suited to industrial plants, commercial buildings and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Beasphase
Model
BEA-D71 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load1 MWBEA-D71-01Connected load: 1 MW1 site · Audit in 1-2 weekson quote
Connected load5 MWBEA-D71-02Connected load: 5 MW1 site · Audit in 1-2 weekson quote
Connected load10 MWBEA-D71-03Connected load: 10 MW1 site · Audit in 1-2 weekson quote
Connected load25 MWBEA-D71-04Connected load: 25 MW1 site · Report in 2-4 weekson quote
Connected load50 MWBEA-D71-05Connected load: 50 MW1 site · Report in 2-4 weekson quote

Specifications

Connected load1 MW to 50 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsPower analyser, thermal camera
AuditorCertified Energy Managermade to order: BEE accredited energy auditor
ReportSavings opportunities with payback
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration3 days
CoverageElectrical and thermal
StatutoryPAT scheme Form-Amade to order: Form-1 and Form-2 filing
DeliverableReport and monitoring plan
Follow-upVerification after implementationmade to order: Not included

BARREL: Bharat Atom Renewable Resources Energy Limited