Building energy audit, Pro seriesSample
by Beasphase Advisory (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Beasphase Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Pro service of building energy audit by Beasphase covers 5 connected load options (1 MW to 50 MW). Design: verification after implementation, payback and ROI ranking and savings quantified with measured data. Suited to industrial plants, commercial buildings and PAT designated consumers. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Beasphase
- Model
- BEA-D71 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load1 MWBEA-D71-01 | Connected load: 1 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load5 MWBEA-D71-02 | Connected load: 5 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load10 MWBEA-D71-03 | Connected load: 10 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load25 MWBEA-D71-04 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load50 MWBEA-D71-05 | Connected load: 50 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 1 MW to 50 MW (see variants) |
|---|---|
| Audit level | Investment-grade audit |
| Instruments | Power analyser, thermal camera |
| Auditor | Certified Energy Managermade to order: BEE accredited energy auditor |
| Report | Savings opportunities with payback |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 3 days |
| Coverage | Electrical and thermal |
| Statutory | PAT scheme Form-Amade to order: Form-1 and Form-2 filing |
| Deliverable | Report and monitoring plan |
| Follow-up | Verification after implementationmade to order: Not included |