Catalogue / Water testing laboratories
Drinking water testing as per IS 10500, Neo 3 seriesSample
by Betwafaraday Water Technologies (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Betwafaraday Water Technologies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Betwafaraday Neo 3 drinking water testing as per IS 10500, offered in 6 parameter panel options from Basic 10 parameters to Complete 60+ parameters. Highlights: interpretation notes provided, fast track report option and report compared with IS limits. Used by solar plant cleaning water, township water quality and power plant water chemistry. Delivered in line with IS 3025, IS 10500 and ISO/IEC 17025. Mobilisation 3-5 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Betwafaraday
- Model
- BET-B79 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-5 days
- Warranty
- Free re-test on lab error
- Standards
- IS 3025, IS 10500, ISO/IEC 17025
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Parameter panelBasic 10 parametersBET-B79-01 | Parameter panel: Basic 10 parameters | 1 job · 3-5 days | on quote |
| Parameter panelPhysical and chemical 25BET-B79-02 | Parameter panel: Physical and chemical 25 | 1 job · 3-5 days | on quote |
| Parameter panelFull IS 10500BET-B79-03 | Parameter panel: Full IS 10500 | 1 job · 3-5 days | on quote |
| Parameter panelHeavy metals panelBET-B79-04 | Parameter panel: Heavy metals panel | 1 job · 3-5 days | on quote |
| Parameter panelEffluent CPCB panelBET-B79-05 | Parameter panel: Effluent CPCB panel | 1 job · 7-10 days | on quote |
| Parameter panelComplete 60+ parametersBET-B79-06 | Parameter panel: Complete 60+ parameters | 1 job · 7-10 days | on quote |
Specifications
| Parameter panel | Basic 10 parameters to Complete 60+ parameters (see variants) |
|---|---|
| Sample type | Cooling watermade to order: Water / Wastewater / Boiler water |
| Reporting | Digital report |
| Accreditation | NABL accredited |
| Turnaround | 3 days |
| Sample volume | 5 litremade to order: 2 litre |
| Collection | Client collected |
| Methods | IS 3025 |
| Sample transport | Chilledmade to order: Ambient |
| Report format | IS 10500 comparison |