Catalogue / Water testing laboratories
Transformer coolant and make-up water test, Neo seriesSample
by Betwafaraday Water Technologies (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Betwafaraday Water Technologies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Betwafaraday Neo transformer coolant and make-up water test, offered in 5 parameter panel options from Basic 10 parameters to Effluent CPCB panel. Highlights: sample retention for query period, interpretation notes provided and fast track report option. Suited to township water quality, statutory consent compliance and solar plant cleaning water. Delivered in line with IS 3025, IS 10500 and ISO/IEC 17025. Mobilisation 3-5 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Betwafaraday
- Model
- BET-304 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-5 days
- Warranty
- Free re-test on lab error
- Standards
- IS 3025, IS 10500, ISO/IEC 17025
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Parameter panelBasic 10 parametersBET-304-01 | Parameter panel: Basic 10 parameters | 1 job · 3-5 days | on quote |
| Parameter panelPhysical and chemical 25BET-304-02 | Parameter panel: Physical and chemical 25 | 1 job · 3-5 days | on quote |
| Parameter panelFull IS 10500BET-304-03 | Parameter panel: Full IS 10500 | 1 job · 3-5 days | on quote |
| Parameter panelHeavy metals panelBET-304-04 | Parameter panel: Heavy metals panel | 1 job · 7-10 days | on quote |
| Parameter panelEffluent CPCB panelBET-304-05 | Parameter panel: Effluent CPCB panel | 1 job · 7-10 days | on quote |
Specifications
| Parameter panel | Basic 10 parameters to Effluent CPCB panel (see variants) |
|---|---|
| Sample type | Wastewatermade to order: Water / Boiler water / Cooling water |
| Reporting | Hard copy with seal |
| Accreditation | NABL accredited |
| Turnaround | 3 daysmade to order: 7 days / 10 days |
| Sample volume | 5 litre |
| Collection | Lab collected |
| Methods | APHA |
| Sample transport | Chilled |
| Report format | CPCB compliance |