Catalogue / Ethanol & biofuel plant equipment

No photo yet

Ethanol distillation column set, Neo seriesSample

by Betwatrishul Waste to Energy (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Betwatrishul Waste to Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Betwatrishul Neo ethanol distillation column set, offered in 3 plant capacity options from 150 KLPD to 300 KLPD. Design: energy-integrated multi-pressure design, dual-feed capability for grain and molasses and meets E20 blending ethanol specification. Typically used for ethanol distilleries under EBP programme, sugar mills adding ethanol and biofuel start-ups. Designed and tested to IS 15464, IS 15464 (E20 blending) and IS 2002. Lead time 14-20 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Betwatrishul
Model
BET-2D3 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
14-20 months
Warranty
12 months
Standards
IS 15464, IS 15464 (E20 blending), IS 2002
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR site, freight included
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity150 KLPDBET-2D3-01Plant capacity: 150 KLPD1 lot · 14-20 monthson quote
Plant capacity200 KLPDBET-2D3-02Plant capacity: 200 KLPD1 lot · 14-20 monthson quote
Plant capacity300 KLPDBET-2D3-03Plant capacity: 300 KLPD1 lot · 14-20 monthson quote

Specifications

Plant capacity150 KLPD to 300 KLPD (see variants)
FeedstockCellulosic
DistillationMulti-pressuremade to order: Atmospheric
DehydrationMolecular sieve
Product purity99.5% v/v
Steam consumption1.8 kg/l
Fermenter materialSS 304
AutomationPLC
Spent washZLD evaporator system
Power requirement2 MW
Fusel oil recoveryIncluded

BARREL: Bharat Atom Renewable Resources Energy Limited