Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Waste-to-energy moving grate system, Prime seriesSample

by Betwatrishul Waste to Energy (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Betwatrishul Waste to Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Waste-to-energy moving grate system from Betwatrishul, Prime series: 5 plant capacity options between 100 TPD and 1000 TPD. Highlights: bottom ash used in brick or road base, automated crane and grate control and odour control through negative pressure bunker. Used by urban local bodies, municipal corporations and PPP waste-to-energy developers. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Betwatrishul
Model
BET-A71 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
24-30 months
Warranty
Performance guarantee as per contract
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity100 TPDBET-A71-01Plant capacity: 100 TPD2 lot · 24-30 monthsfor verified buyers
Plant capacity300 TPDBET-A71-02Plant capacity: 300 TPD2 lot · 24-30 monthsfor verified buyers
Plant capacity500 TPDBET-A71-03Plant capacity: 500 TPD2 lot · 24-30 monthsfor verified buyers
Plant capacity750 TPDBET-A71-04Plant capacity: 750 TPD2 lot · 24-30 monthsfor verified buyers
Plant capacity1000 TPDBET-A71-05Plant capacity: 1000 TPD2 lot · 24-30 monthsfor verified buyers

Specifications

Plant capacity100 TPD to 1000 TPD (see variants)
TechnologyFluidised bed
FuelIndustrial wastemade to order: MSW / RDF
Calorific value3200 kcal/kgmade to order: 1500 kcal/kg / 2500 kcal/kg
Steam parameters42 bar / 400 Cmade to order: 67 bar / 485 C
Power output20 MWmade to order: 3 MW / 10 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited