Catalogue / Waste-to-energy (incineration, RDF)
RDF-fired boiler and turbine plant, Pro seriesSample
by Bundel Bioenergy Systems (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Bundel Bioenergy Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Pro range of RDF-fired boiler and turbine plant by Bundel covers 4 plant capacity options (500 TPD to 1500 TPD). Highlights: steam turbine heat recovery, automated crane and grate control and continuous emission monitoring linked to CPCB. Suited to PPP waste-to-energy developers, urban local bodies and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Bundel
- Model
- BUN-269 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 24-30 months
- Warranty
- Performance guarantee as per contract
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity500 TPDBUN-269-01 | Plant capacity: 500 TPD | 1 lot · 24-30 months | on quote |
| Plant capacity750 TPDBUN-269-02 | Plant capacity: 750 TPD | 1 lot · 24-30 months | on quote |
| Plant capacity1000 TPDBUN-269-03 | Plant capacity: 1000 TPD | 1 lot · 24-30 months | on quote |
| Plant capacity1500 TPDBUN-269-04 | Plant capacity: 1500 TPD | 1 lot · 24-30 months | on quote |
Specifications
| Plant capacity | 500 TPD to 1500 TPD (see variants) |
|---|---|
| Technology | Moving gratemade to order: Fluidised bed / Gasification |
| Fuel | MSW |
| Calorific value | 2500 kcal/kg |
| Steam parameters | 42 bar / 400 C |
| Power output | 10 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |