Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

RDF-fired boiler and turbine plant, Pro seriesSample

by Bundel Bioenergy Systems (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Bundel Bioenergy Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Pro range of RDF-fired boiler and turbine plant by Bundel covers 4 plant capacity options (500 TPD to 1500 TPD). Highlights: steam turbine heat recovery, automated crane and grate control and continuous emission monitoring linked to CPCB. Suited to PPP waste-to-energy developers, urban local bodies and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Bundel
Model
BUN-269 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
24-30 months
Warranty
Performance guarantee as per contract
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity500 TPDBUN-269-01Plant capacity: 500 TPD1 lot · 24-30 monthson quote
Plant capacity750 TPDBUN-269-02Plant capacity: 750 TPD1 lot · 24-30 monthson quote
Plant capacity1000 TPDBUN-269-03Plant capacity: 1000 TPD1 lot · 24-30 monthson quote
Plant capacity1500 TPDBUN-269-04Plant capacity: 1500 TPD1 lot · 24-30 monthson quote

Specifications

Plant capacity500 TPD to 1500 TPD (see variants)
TechnologyMoving gratemade to order: Fluidised bed / Gasification
FuelMSW
Calorific value2500 kcal/kg
Steam parameters42 bar / 400 C
Power output10 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited