Catalogue / Waste-to-energy (incineration, RDF)
Flue gas cleaning train for WtE, Plus seriesSample
by Bundel Bioenergy Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Bundel Bioenergy Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Bundel Plus flue gas cleaning train for WtE, offered in 4 plant capacity options from 300 TPD to 1000 TPD. Highlights: meets CPCB dioxin and furan limits, steam turbine heat recovery and bottom ash used in brick or road base. Used by urban local bodies, municipal corporations and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Bundel
- Model
- BUN-7E5 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 10 lot
- Lead time
- 18-24 months
- Warranty
- 24 months
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Door delivery in metro cities
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity300 TPDBUN-7E5-01 | Plant capacity: 300 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity500 TPDBUN-7E5-02 | Plant capacity: 500 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity750 TPDBUN-7E5-03 | Plant capacity: 750 TPD | 10 lot · 24-30 months | for verified buyers |
| Plant capacity1000 TPDBUN-7E5-04 | Plant capacity: 1000 TPD | 10 lot · 24-30 months | for verified buyers |
Specifications
| Plant capacity | 300 TPD to 1000 TPD (see variants) |
|---|---|
| Technology | Fluidised bedmade to order: Moving grate / Gasification |
| Fuel | MSWmade to order: RDF / Industrial waste |
| Calorific value | 1500 kcal/kgmade to order: 2500 kcal/kg / 3200 kcal/kg |
| Steam parameters | 42 bar / 400 C |
| Power output | 3 MWmade to order: 10 MW / 20 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |