Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Flue gas cleaning train for WtE, Plus seriesSample

by Bundel Bioenergy Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Bundel Bioenergy Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Bundel Plus flue gas cleaning train for WtE, offered in 4 plant capacity options from 300 TPD to 1000 TPD. Highlights: meets CPCB dioxin and furan limits, steam turbine heat recovery and bottom ash used in brick or road base. Used by urban local bodies, municipal corporations and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Bundel
Model
BUN-7E5 series
Listing type
Product
Unit
lot
Minimum order
10 lot
Lead time
18-24 months
Warranty
24 months
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Door delivery in metro cities
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity300 TPDBUN-7E5-01Plant capacity: 300 TPD10 lot · 18-24 monthsfor verified buyers
Plant capacity500 TPDBUN-7E5-02Plant capacity: 500 TPD10 lot · 18-24 monthsfor verified buyers
Plant capacity750 TPDBUN-7E5-03Plant capacity: 750 TPD10 lot · 24-30 monthsfor verified buyers
Plant capacity1000 TPDBUN-7E5-04Plant capacity: 1000 TPD10 lot · 24-30 monthsfor verified buyers

Specifications

Plant capacity300 TPD to 1000 TPD (see variants)
TechnologyFluidised bedmade to order: Moving grate / Gasification
FuelMSWmade to order: RDF / Industrial waste
Calorific value1500 kcal/kgmade to order: 2500 kcal/kg / 3200 kcal/kg
Steam parameters42 bar / 400 C
Power output3 MWmade to order: 10 MW / 20 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited