Catalogue / Waste-to-energy (incineration, RDF)
Flue gas cleaning train for WtE, Edge seriesSample
by Bundeljal Bioenergy Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Bundeljal Bioenergy Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Flue gas cleaning train for WtE from Bundeljal, Edge series: 6 plant capacity options between 100 TPD and 1500 TPD. Highlights: continuous emission monitoring linked to CPCB, steam turbine heat recovery and odour control through negative pressure bunker. Typically used for urban local bodies, industrial waste processors and PPP waste-to-energy developers. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Bundeljal
- Model
- BUN-7E5 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 10 lot
- Lead time
- 18-24 months
- Warranty
- 24 months
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity100 TPDBUN-7E5-01 | Plant capacity: 100 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity300 TPDBUN-7E5-02 | Plant capacity: 300 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity500 TPDBUN-7E5-03 | Plant capacity: 500 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity750 TPDBUN-7E5-04 | Plant capacity: 750 TPD | 10 lot · 18-24 months | for verified buyers |
| Plant capacity1000 TPDBUN-7E5-05 | Plant capacity: 1000 TPD | 10 lot · 24-30 months | for verified buyers |
| Plant capacity1500 TPDBUN-7E5-06 | Plant capacity: 1500 TPD | 10 lot · 24-30 months | for verified buyers |
Specifications
| Plant capacity | 100 TPD to 1500 TPD (see variants) |
|---|---|
| Technology | Fluidised bedmade to order: Moving grate / Gasification |
| Fuel | RDF |
| Calorific value | 3200 kcal/kg |
| Steam parameters | 67 bar / 485 C |
| Power output | 10 MWmade to order: 3 MW / 20 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |