Catalogue / Waste-to-energy (incineration, RDF)
RDF-fired boiler and turbine plant, Plus seriesSample
by Bundeljal Bioenergy Systems (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Bundeljal Bioenergy Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
RDF-fired boiler and turbine plant from Bundeljal, Plus series: 4 plant capacity options between 300 TPD and 1000 TPD. Key features: steam turbine heat recovery, automated crane and grate control and continuous emission monitoring linked to CPCB. Suited to municipal corporations, industrial waste processors and PPP waste-to-energy developers. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Bundeljal
- Model
- BUN-264 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 2 lot
- Lead time
- 18-24 months
- Warranty
- 24 months
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity300 TPDBUN-264-01 | Plant capacity: 300 TPD | 2 lot · 18-24 months | on quote |
| Plant capacity500 TPDBUN-264-02 | Plant capacity: 500 TPD | 2 lot · 18-24 months | on quote |
| Plant capacity750 TPDBUN-264-03 | Plant capacity: 750 TPD | 2 lot · 24-30 months | on quote |
| Plant capacity1000 TPDBUN-264-04 | Plant capacity: 1000 TPD | 2 lot · 24-30 months | on quote |
Specifications
| Plant capacity | 300 TPD to 1000 TPD (see variants) |
|---|---|
| Technology | Gasificationmade to order: Moving grate / Fluidised bed |
| Fuel | MSW |
| Calorific value | 2500 kcal/kg |
| Steam parameters | 42 bar / 400 Cmade to order: 67 bar / 485 C |
| Power output | 20 MWmade to order: 3 MW / 10 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |