Catalogue / Transformer plinths, oil pits & soak pits

No photo yet

Fire wall between transformers, Ultra seriesSample

by Chambalgrid Structures (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Chambalgrid Structures (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Ultra service of fire wall between transformers by Chambalgrid covers 3 transformer rating served options (31.5 MVA to 100 MVA). Design: flame arrester stone bed, oil sump sized for full oil volume and water-oil separator option. Used by generation transformer bays, power substations and solar and wind pooling stations. Delivered in line with IS 456, IS 10028 (Part 2) and CBIP Manual 317. Mobilisation 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Chambalgrid
Model
CHA-A66 series
Listing type
Service
Unit
nos
Minimum order
1 nos
Lead time
2-3 weeks
Warranty
12 months defect liability
Standards
IS 456, IS 10028 (Part 2), CBIP Manual 317
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating served31.5 MVACHA-A66-01Transformer rating served: 31.5 MVA1 nos · 2-3 weeksfor verified buyers
Transformer rating served50 MVACHA-A66-02Transformer rating served: 50 MVA1 nos · 2-3 weeksfor verified buyers
Transformer rating served100 MVACHA-A66-03Transformer rating served: 100 MVA1 nos · 2-3 weeksfor verified buyers

Specifications

Transformer rating served31.5 MVA to 100 MVA (see variants)
Concrete gradeM30
Oil pit capacity110% of oil volume
Pit fillGravel 400 mm
Pit waterproofingIntegral waterproofing
Drain pipe200 NB
Fire wall height4 mmade to order: None / 3 m
Fire wall thickness230 mm brickmade to order: 300 mm RCC
Rail trackNonemade to order: ISMB 150 rails
ReinforcementFe 500D
Earth pit2 nos