Catalogue / Battery chargers & DC systems

No photo yet

48 V DC system for telecom, Max 5 seriesSample

by Chambalparam Power Controls (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Chambalparam Power Controls (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Max 5 range of 48 V DC system for telecom by Chambalparam covers 5 rating options (10 A to 200 A). Design: earth fault detection with alarm, temperature compensated charging and parallel redundant chargers. Suited to solar and wind pooling stations, power plants and railway signalling. Designed and tested to IS 4540, IEC 61204 and IS 1651. Lead time 6-8 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Chambalparam
Model
CHA-226 series
Listing type
Product
Unit
nos
Minimum order
2 nos
Lead time
6-8 weeks
Warranty
24 months
Standards
IS 4540, IEC 61204, IS 1651
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
Door delivery in metro cities
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating10 ACHA-226-01Rating: 10 A2 nos · 6-8 weeksfor verified buyers
Rating25 ACHA-226-02Rating: 25 A2 nos · 6-8 weeksfor verified buyers
Rating50 ACHA-226-03Rating: 50 A2 nos · 6-8 weeksfor verified buyers
Rating100 ACHA-226-04Rating: 100 A2 nos · 6-8 weeksfor verified buyers
Rating200 ACHA-226-05Rating: 200 A2 nos · 6-8 weeksfor verified buyers

Specifications

Rating10 A to 200 A (see variants)
Output voltage220 V
Input415 V 3-ph
TopologyThyristor
Voltage regulation+/- 1%
Ripple< 2% without battery
Efficiency92%
RedundancyN+1
Battery typeNi-Cdmade to order: VRLA / Li-ion
Backup time4 hoursmade to order: 2 hours / 8 hours
DC distributionMCB / MCCB with ground fault detection
CommunicationModbus RTU
EnclosureIP31

BARREL: Bharat Atom Renewable Resources Energy Limited