Catalogue / Substation automation (IEC 61850)

No photo yet

IEC 61850 substation automation system, Prime seriesSample

by Chambalparam Power Controls (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Chambalparam Power Controls (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Prime range of IEC 61850 substation automation system by Chambalparam covers 3 bays options (Up to 32 bays to Up to 128 bays). Highlights: sequence of events recorder, single-line diagram with live status and cyber-secure remote access. Used by discom 33/11 kV substations, metro traction and industrial plants. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 16-24 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Chambalparam
Model
CHA-A53 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
16-24 weeks
Warranty
36 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 32 baysCHA-A53-01Bays: Up to 32 bays1 lot · 16-24 weekson quote
BaysUp to 64 baysCHA-A53-02Bays: Up to 64 bays1 lot · 16-24 weekson quote
BaysUp to 128 baysCHA-A53-03Bays: Up to 128 bays1 lot · 16-24 weekson quote

Specifications

BaysUp to 32 bays to Up to 128 bays (see variants)
ArchitectureStation + process busmade to order: Station bus
ProtocolIEC 61850 Ed 2made to order: IEC 60870-5-104 / DNP3
Network topologyHSR ringmade to order: Dual star / PRP
HMIRedundant serversmade to order: Single HMI
Time syncSNTPmade to order: GPS with PTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply110 V DCmade to order: 220 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited