Time-of-day tariff optimisation, Flex 3 seriesSample
by Chambalsurya Capital Advisors (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Chambalsurya Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Flex 3 service of time-of-day tariff optimisation by Chambalsurya covers 6 curtailable load options (0.5 MW to 50 MW). Design: support for grid operators, real-time dashboards and settlement transparency. Used by commercial buildings, cold storage and water pumping and industrial plants with flexible load. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Chambalsurya
- Model
- CHA-1A5 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWCHA-1A5-01 | Curtailable load: 0.5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load1 MWCHA-1A5-02 | Curtailable load: 1 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load5 MWCHA-1A5-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load10 MWCHA-1A5-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load25 MWCHA-1A5-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | on quote |
| Curtailable load50 MWCHA-1A5-06 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | on quote |
Specifications
| Curtailable load | 0.5 MW to 50 MW (see variants) |
|---|---|
| Programme | Aggregator DRmade to order: Utility DR / TOD optimisation |
| Control | Manualmade to order: Automated through SCADA |
| Notice | 2 hours |
| Duration per event | 1 hour |
| Events per year | Unlimited |
| Metering | Dedicated interval metermade to order: Existing meter |
| Incentive sharing | 80:20made to order: 70:30 customer:aggregator |
| Baseline method | Regression |
| Reporting | Monthly savings |
| Contract term | 3 years |