Thermal and utility energy audit, Ultra seriesSample
by Chambalsurya Capital Advisors (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Chambalsurya Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Thermal and utility energy audit from Chambalsurya, Ultra series: 5 connected load options between 100 kW and 10 MW. Key features: solar and efficiency retrofit options, verification after implementation and savings quantified with measured data. Used by industrial plants, PAT designated consumers and commercial buildings. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Chambalsurya
- Model
- CHA-394 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWCHA-394-01 | Connected load: 100 kW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load500 kWCHA-394-02 | Connected load: 500 kW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load1 MWCHA-394-03 | Connected load: 1 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load5 MWCHA-394-04 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load10 MWCHA-394-05 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 100 kW to 10 MW (see variants) |
|---|---|
| Audit level | Detailed auditmade to order: Walk-through / Investment-grade audit |
| Instruments | Power analyser, thermal camera |
| Auditor | Certified Energy Managermade to order: BEE accredited energy auditor |
| Report | Implementation roadmapmade to order: Savings opportunities with payback |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 7 days |
| Coverage | Electrical and thermal |
| Statutory | Form-1 and Form-2 filing |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Not included |