Catalogue / Furnace & rectifier transformers

No photo yet

Electric arc furnace transformer, Prime 3 seriesSample

by Chambal Transformers (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Chambal Transformers (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Chambal Prime 3 electric arc furnace transformer, offered in 5 rating options from 5 MVA to 60 MVA. Design: optional built-in series reactor, withstands frequent short-circuit duty and low stray flux heating. Typically used for green hydrogen electrolysers, aluminium smelters and ferro-alloy plants. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 16-20 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Chambal
Model
CHA-2B3 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
16-20 weeks
Warranty
24 months
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating5 MVACHA-2B3-01Rating: 5 MVA1 nos · 16-20 weekson quote
Rating10 MVACHA-2B3-02Rating: 10 MVA1 nos · 16-20 weekson quote
Rating20 MVACHA-2B3-03Rating: 20 MVA1 nos · 16-20 weekson quote
Rating40 MVACHA-2B3-04Rating: 40 MVA1 nos · 28-36 weekson quote
Rating60 MVACHA-2B3-05Rating: 60 MVA1 nos · 28-36 weekson quote

Specifications

Rating5 MVA to 60 MVA (see variants)
Primary voltage132 kVmade to order: 11 kV / 33 kV / 66 kV
Secondary voltageUp to 400 V DC rectified
ApplicationLRF
CoolingONAN/ONAFmade to order: OFWF / OFAF
Tap changerOLTCmade to order: Off-circuit
Secondary tapsUp to 21 steps
Vector groupDy11
Overload20% for 2 hours
Impedance6%made to order: 8%
ReactorExternalmade to order: In-built
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited