Catalogue / Civil & foundation works
Site roads, drainage and boundary wall, Smart seriesSample
by Chola Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Chola Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Chola Smart site roads, drainage and boundary wall, offered in 3 works volume options from 5 MW equivalent to 25 MW equivalent. Design: pile layout tolerance maintained to design, daily quantity and progress log and waterproofing for cable trenches. Suited to solar parks, wind farms and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Chola
- Model
- CHO-5E7 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume5 MW equivalentCHO-5E7-01 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentCHO-5E7-02 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentCHO-5E7-03 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 5 MW equivalent to 25 MW equivalent (see variants) |
|---|---|
| Foundation type | Raft or isolated footing |
| Concrete grade | M40 for turbine foundation |
| Pull-out testing | 2% piles testedmade to order: Random test plus lateral load |
| Reinforcement | Fe 500D TMTmade to order: Fe 550D |
| Roads and drainage | WBM road with culverts |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | NABL lab testing of materials |
| Machinery | Batching plant at sitemade to order: Piling rigs and excavators |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Measured running billsmade to order: Item rate with retention |