Catalogue / Cabling, trenching & HDD works
Duct bank and conduit installation, Eco 9 seriesSample
by Chola Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Chola Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Duct bank and conduit installation from Chola, Eco 9 series: 6 cable route length options between 1 km and 50 km. Highlights: warning tape and marker installation, dewatering in high water table and traffic management at crossings. Used by renewable plant internal networks, urban distribution upgrades and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Chola
- Model
- CHO-C11 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmCHO-C11-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | on quote |
| Cable route length2 kmCHO-C11-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | on quote |
| Cable route length5 kmCHO-C11-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | on quote |
| Cable route length10 kmCHO-C11-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | on quote |
| Cable route length20 kmCHO-C11-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmCHO-C11-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Open trench |
| HDD capacity | Up to 450 mm boremade to order: Up to 250 mm bore |
| Trench depth | 0.9 mmade to order: 1.2 m / 1.5 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Road and footpath restoration |
| Permissions | Contractor arranges road cut approvals |
| Testing | Insulation and VLF test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | HDD crew of 8 with rig |