Catalogue / Cabling, trenching & HDD works

No photo yet

Duct bank and conduit installation, Eco 9 seriesSample

by Chola Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Chola Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Duct bank and conduit installation from Chola, Eco 9 series: 6 cable route length options between 1 km and 50 km. Highlights: warning tape and marker installation, dewatering in high water table and traffic management at crossings. Used by renewable plant internal networks, urban distribution upgrades and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Chola
Model
CHO-C11 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Permits may extend timeline
Warranty
Restoration warranty 6 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length1 kmCHO-C11-01Cable route length: 1 km1 km · Permits may extend timelineon quote
Cable route length2 kmCHO-C11-02Cable route length: 2 km1 km · Permits may extend timelineon quote
Cable route length5 kmCHO-C11-03Cable route length: 5 km1 km · Permits may extend timelineon quote
Cable route length10 kmCHO-C11-04Cable route length: 10 km1 km · Permits may extend timelineon quote
Cable route length20 kmCHO-C11-05Cable route length: 20 km1 km · Permits may extend timelineon quote
Cable route length50 kmCHO-C11-06Cable route length: 50 km1 km · Permits may extend timelineon quote

Specifications

Cable route length1 km to 50 km (see variants)
MethodOpen trench
HDD capacityUp to 450 mm boremade to order: Up to 250 mm bore
Trench depth0.9 mmade to order: 1.2 m / 1.5 m
Cable type11/33 kV XLPE
JointingHeat shrinkmade to order: Cold shrink / Premoulded
RestorationRoad and footpath restoration
PermissionsContractor arranges road cut approvals
TestingInsulation and VLF test
Productivity50 m per day HDDmade to order: 300 m per day open trench
CrewHDD crew of 8 with rig

BARREL: Bharat Atom Renewable Resources Energy Limited