Catalogue / Engineering & design
Balance-of-plant electrical design, Flex 5 seriesSample
by Chola Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Chola Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Balance-of-plant electrical design from Chola, Flex 5 series: 3 plant capacity options between 1 MW and 10 MW. Key features: protection and relay coordination philosophy, cable sizing and voltage drop calculations and yield and loss modelling aligned to bankable reports. Typically used for IPPs and developers, captive and C&I solar owners and EPC contractors bidding for projects. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 7 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Chola
- Model
- CHO-CE1 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 7 days
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWCHO-CE1-01 | Plant capacity: 1 MW | 1 job · Mobilisation in 7 days | on quote |
| Plant capacity5 MWCHO-CE1-02 | Plant capacity: 5 MW | 1 job · Mobilisation in 7 days | on quote |
| Plant capacity10 MWCHO-CE1-03 | Plant capacity: 10 MW | 1 job · Mobilisation in 7 days | on quote |
Specifications
| Plant capacity | 1 MW to 10 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings |
| Design software | PVsyst, STAAD, ETAP, Civil 3D |
| Team | Electrical, civil and SCADA discipline leads |
| Turnaround | 3-4 weeksmade to order: 6-8 weeks / 10-12 weeks |
| Revisions included | Unlimited until approval |
| Authority submission support | CEA/CEIG drawing approvalmade to order: DISCOM/STU drawing approval / None |
| Earthing and LA study | Optional add-onmade to order: Included |
| Format | PDF and native CAD |
| Site visit | Two visits includedmade to order: One visit included / Desk design only |
| Payment milestones | 50% advance, 50% on deliverymade to order: 30% advance, 40% on drafts, 30% on IFC |