Inverter, transformer and switchgear erection, Titan seriesSample
by Chola Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Chola Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Inverter, transformer and switchgear erection from Chola, Titan series: 3 installation scope options between 5 MW and 25 MW. Design: module handling to avoid micro-cracks, punch list closure before testing and mobile team available for remote sites. Typically used for wind farm substations, utility solar parks and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Start after material at site; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Chola
- Model
- CHO-DB2 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Start after material at site
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope5 MWCHO-DB2-01 | Installation scope: 5 MW | 1 MW · Start after material at site | for verified buyers |
| Installation scope10 MWCHO-DB2-02 | Installation scope: 10 MW | 1 MW · Start after material at site | for verified buyers |
| Installation scope25 MWCHO-DB2-03 | Installation scope: 25 MW | 1 MW · Start after material at site | for verified buyers |
Specifications
| Installation scope | 5 MW to 25 MW (see variants) |
|---|---|
| Scope | Electrical BoP erection |
| Manpower deployed | 60 technicians plus supervisorsmade to order: 25 technicians per MW-block / Peak crew of 200 |
| Supervision | Project manager, engineers, QA/QCmade to order: Site engineer and safety officer |
| Equipment | Pile driver, crane, telehandlermade to order: Own cranes and erection tools |
| Quality plan | Client-approved ITP |
| Safety | Daily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA |
| Licence | Electrical contractor licencemade to order: Class A contractor registration |
| Insurance | CAR and workmen compensation |
| Reporting | Daily progress report |