Catalogue / Substation automation (IEC 61850)

No photo yet

Station SCADA with redundant servers, Prime seriesSample

by Chola Protection Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Chola Protection Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Prime range of station SCADA with redundant servers by Chola covers 4 bays options (Up to 16 bays to Up to 128 bays). Design: redundant network with zero-recovery time, fully tested using IEC 61850 configurator and sequence of events recorder. Typically used for discom 33/11 kV substations, industrial plants and transmission substations. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 16-24 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Chola
Model
CHO-351 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
16-24 weeks
Warranty
24 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR site, freight included
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 16 baysCHO-351-01Bays: Up to 16 bays2 lot · 16-24 weeksfor verified buyers
BaysUp to 32 baysCHO-351-02Bays: Up to 32 bays2 lot · 16-24 weeksfor verified buyers
BaysUp to 64 baysCHO-351-03Bays: Up to 64 bays2 lot · 16-24 weeksfor verified buyers
BaysUp to 128 baysCHO-351-04Bays: Up to 128 bays2 lot · 16-24 weeksfor verified buyers

Specifications

BaysUp to 16 bays to Up to 128 bays (see variants)
ArchitectureStation + process busmade to order: Station bus
ProtocolIEC 61850 Ed 2
Network topologyHSR ringmade to order: Dual star / PRP
HMISingle HMI
Time syncGPS with PTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply110 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited