Catalogue / Battery recycling & second life
Battery collection and safe transport, Duo seriesSample
by Coorg Associates (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Coorg Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Battery collection and safe transport from Coorg, Duo series: 5 quantity options between 0.5 tonne and 50 tonnes. Design: safe discharge and packing, authorised recycling and EPR certificate for compliance. Used by telecom and UPS users, BESS operators and battery makers. Delivered in line with Battery Waste Management Rules 2022, Hazardous Waste Rules 2016 and CPCB Guidelines. Mobilisation Pick-up in 7-14 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Coorg
- Model
- COO-E32 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Pick-up in 7-14 days
- Warranty
- Authorisation copies available
- Standards
- Battery Waste Management Rules 2022, Hazardous Waste Rules 2016, CPCB Guidelines
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity0.5 tonneCOO-E32-01 | Quantity: 0.5 tonne | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity1 tonneCOO-E32-02 | Quantity: 1 tonne | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity5 tonnesCOO-E32-03 | Quantity: 5 tonnes | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity10 tonnesCOO-E32-04 | Quantity: 10 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity50 tonnesCOO-E32-05 | Quantity: 50 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 0.5 tonne to 50 tonnes (see variants) |
|---|---|
| Chemistry | Lead-acidmade to order: Li-ion NMC / LFP |
| Process | Hydrometallurgymade to order: Discharging and dismantling / Pyrometallurgy |
| Second life | SoH test and grading |
| Recovery rate | 95% for metalsmade to order: Above 90% |
| Authorisation | CPCB authorised |
| Collection | Client delivers |
| Certificate | Recycling certificate |
| Safety | Fire-safe storagemade to order: Transport per hazardous norms |
| Turnaround | 2-4 weeks |
| Pricing basis | Per tonnemade to order: Value share |