Catalogue / Boiler & turbine spares

No photo yet

Boiler tube set (waterwall), Volt seriesSample

by Coorg Power Plant Equipment (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Coorg Power Plant Equipment (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Volt range of boiler tube set (waterwall) by Coorg covers 4 unit size options (120 MW to 660 MW). Key features: NDT reports on every set, quality inspection by third party available and quick turnaround for forced outages. Used by captive plant O&M, life extension projects and overhaul of thermal units. Designed and tested to IBR 1950, ASTM A213 and ASTM A210. Lead time 4-8 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Coorg
Model
COO-7F2 series
Listing type
Product
Unit
set
Minimum order
2 set
Lead time
4-8 weeks
Warranty
18 months
Standards
IBR 1950, ASTM A213, ASTM A210
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Corrugated box on pallet
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Unit size120 MWCOO-7F2-01Unit size: 120 MW2 set · 4-8 weeksfor verified buyers
Unit size210 MWCOO-7F2-02Unit size: 210 MW2 set · 4-8 weeksfor verified buyers
Unit size500 MWCOO-7F2-03Unit size: 500 MW2 set · 12-20 weeksfor verified buyers
Unit size660 MWCOO-7F2-04Unit size: 660 MW2 set · 12-20 weeksfor verified buyers

Specifications

Unit size120 MW to 660 MW (see variants)
ComponentBoiler tubes
Tube materialSA 213 T22
Blade material17-4 PH
OEM compatibilityBHEL type
Surface treatmentHVOF coatingmade to order: Stellite shielding
TestingHydro, UT, DP
Dimensional toleranceAs per OEM drawing
Heat treatmentNormalised and tempered
DocumentationMTC and NDT reports
ConditionNew

BARREL: Bharat Atom Renewable Resources Energy Limited