Catalogue / Steam turbines & condensers
Extraction-condensing steam turbine, Max 2 seriesSample
by Coorgshakti Boilers (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Coorgshakti Boilers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Max 2 range of extraction-condensing steam turbine by Coorgshakti covers 5 output options (30 MW to 500 MW). Highlights: efficient blade profiles with high efficiency, electro-hydraulic governing system and fully assembled skid for small units. Typically used for waste heat to power, utility power stations and captive power plants. Designed and tested to IEC 60045, IS 4351 and HEI standards. Lead time 14-20 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Coorgshakti
- Model
- COO-D18 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 14-20 months
- Warranty
- 12 months
- Standards
- IEC 60045, IS 4351, HEI standards
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- Door delivery in metro cities
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Output30 MWCOO-D18-01 | Output: 30 MW | 10 nos · 14-20 months | for verified buyers |
| Output60 MWCOO-D18-02 | Output: 60 MW | 10 nos · 14-20 months | for verified buyers |
| Output120 MWCOO-D18-03 | Output: 120 MW | 10 nos · 14-20 months | for verified buyers |
| Output250 MWCOO-D18-04 | Output: 250 MW | 10 nos · 14-20 months | for verified buyers |
| Output500 MWCOO-D18-05 | Output: 500 MW | 10 nos · 14-20 months | for verified buyers |
Specifications
| Output | 30 MW to 500 MW (see variants) |
|---|---|
| Turbine type | Extractionmade to order: Back-pressure / Condensing |
| Inlet steam | 130 ata / 535 C |
| Speed | 5500 rpm with gearboxmade to order: 3000 rpm |
| Exhaust pressure | 3.5 atamade to order: 0.1 ata / 8 ata |
| Condenser type | Shell and tubemade to order: Air cooled |
| Tube material | Admiralty brass |
| Governing | Electro-hydraulic |
| Generator coupling | Gearboxmade to order: Direct |
| Extraction | Double |
| Lube oil system | AC and DC driven pumps |