Catalogue / Steam turbines & condensers
Extraction-condensing steam turbine, Pro 8 seriesSample
by Coorgshakti Boilers (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Coorgshakti Boilers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Extraction-condensing steam turbine from Coorgshakti, Pro 8 series: 6 output options between 5 MW and 250 MW. Design: extraction for process steam, efficient blade profiles with high efficiency and vibration and temperature monitoring. Used by utility power stations, waste heat to power and sugar cogeneration. Designed and tested to IEC 60045, IS 4351 and HEI standards. Lead time 8-12 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Coorgshakti
- Model
- COO-D12 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 8-12 months
- Warranty
- 18 months
- Standards
- IEC 60045, IS 4351, HEI standards
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Output5 MWCOO-D12-01 | Output: 5 MW | 1 nos · 8-12 months | for verified buyers |
| Output12 MWCOO-D12-02 | Output: 12 MW | 1 nos · 8-12 months | for verified buyers |
| Output30 MWCOO-D12-03 | Output: 30 MW | 1 nos · 8-12 months | for verified buyers |
| Output60 MWCOO-D12-04 | Output: 60 MW | 1 nos · 8-12 months | for verified buyers |
| Output120 MWCOO-D12-05 | Output: 120 MW | 1 nos · 14-20 months | for verified buyers |
| Output250 MWCOO-D12-06 | Output: 250 MW | 1 nos · 14-20 months | for verified buyers |
Specifications
| Output | 5 MW to 250 MW (see variants) |
|---|---|
| Turbine type | Condensingmade to order: Back-pressure / Extraction |
| Inlet steam | 67 ata / 485 Cmade to order: 45 ata / 440 C / 130 ata / 535 C |
| Speed | 5500 rpm with gearbox |
| Exhaust pressure | 8 atamade to order: 0.1 ata / 3.5 ata |
| Condenser type | Air cooledmade to order: Shell and tube |
| Tube material | SS 304 |
| Governing | Electro-hydraulic |
| Generator coupling | Direct |
| Extraction | None |
| Lube oil system | AC and DC driven pumps |