Catalogue / Waste-to-energy (incineration, RDF)
Municipal solid waste incinerator, Core 9 seriesSample
by Coromandel Bio Energy (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Coromandel Bio Energy (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Core 9 range of municipal solid waste incinerator by Coromandel covers 3 plant capacity options (500 TPD to 1000 TPD). Design: odour control through negative pressure bunker, steam turbine heat recovery and bottom ash used in brick or road base. Used by municipal corporations, PPP waste-to-energy developers and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Coromandel
- Model
- COR-1E6 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 24-30 months
- Warranty
- Performance guarantee as per contract
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity500 TPDCOR-1E6-01 | Plant capacity: 500 TPD | 1 lot · 24-30 months | for verified buyers |
| Plant capacity750 TPDCOR-1E6-02 | Plant capacity: 750 TPD | 1 lot · 24-30 months | for verified buyers |
| Plant capacity1000 TPDCOR-1E6-03 | Plant capacity: 1000 TPD | 1 lot · 24-30 months | for verified buyers |
Specifications
| Plant capacity | 500 TPD to 1000 TPD (see variants) |
|---|---|
| Technology | Moving grate |
| Fuel | MSWmade to order: RDF / Industrial waste |
| Calorific value | 3200 kcal/kg |
| Steam parameters | 67 bar / 485 C |
| Power output | 3 MWmade to order: 10 MW / 20 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |