Catalogue / Furnace & rectifier transformers

No photo yet

Rectifier transformer for electrolysis, Edge 8 seriesSample

by Coromandel Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Coromandel Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Edge 8 range of rectifier transformer for electrolysis by Coromandel covers 6 rating options (5 MVA to 100 MVA). Key features: heavy-duty OLTC for many operations per day, rigid winding clamping and low stray flux heating. Used by green hydrogen electrolysers, aluminium smelters and steel melting shops. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Coromandel
Model
COR-BF2 series
Listing type
Product
Unit
nos
Minimum order
10 nos
Lead time
28-36 weeks
Warranty
24 months
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating5 MVACOR-BF2-01Rating: 5 MVA10 nos · 28-36 weeksfor verified buyers
Rating10 MVACOR-BF2-02Rating: 10 MVA10 nos · 28-36 weeksfor verified buyers
Rating20 MVACOR-BF2-03Rating: 20 MVA10 nos · 28-36 weeksfor verified buyers
Rating40 MVACOR-BF2-04Rating: 40 MVA10 nos · 28-36 weeksfor verified buyers
Rating60 MVACOR-BF2-05Rating: 60 MVA10 nos · 28-36 weeksfor verified buyers
Rating100 MVACOR-BF2-06Rating: 100 MVA10 nos · 28-36 weeksfor verified buyers

Specifications

Rating5 MVA to 100 MVA (see variants)
Primary voltage33 kV
Secondary voltageUp to 1000 V
ApplicationSAF
CoolingONAN/ONAFmade to order: OFWF / OFAF
Tap changerOLTC
Secondary tapsUp to 21 steps
Vector groupDd0
Overload20% for 2 hours
Impedance8%
ReactorIn-built
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited