Catalogue / OHE masts, cantilevers & catenary
OHE mast, Titan 3 seriesSample
by Dhruvline Traction Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Dhruvline Traction Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Titan 3 range of OHE mast by Dhruvline covers 6 mast type options (Single track mast to Booster mast). Key features: galvanised after fabrication, quality inspected by RDSO nominated agencies and suitable for 25 kV AC traction. Typically used for dedicated freight corridors, port railways and railway electrification. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 8-12 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Dhruvline
- Model
- DHR-F82 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 8-12 weeks
- Warranty
- 12 months
- Standards
- RDSO TI/SPC/OHE, IS 800, IS 2062
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- Door delivery in metro cities
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Mast typeSingle track mastDHR-F82-01 | Mast type: Single track mast | 1 nos · 8-12 weeks | for verified buyers |
| Mast typeDouble track mastDHR-F82-02 | Mast type: Double track mast | 1 nos · 8-12 weeks | for verified buyers |
| Mast typePortal 2-trackDHR-F82-03 | Mast type: Portal 2-track | 1 nos · 8-12 weeks | for verified buyers |
| Mast typePortal 4-trackDHR-F82-04 | Mast type: Portal 4-track | 1 nos · 8-12 weeks | for verified buyers |
| Mast typeTunnel bracketDHR-F82-05 | Mast type: Tunnel bracket | 1 nos · 8-12 weeks | for verified buyers |
| Mast typeBooster mastDHR-F82-06 | Mast type: Booster mast | 1 nos · 8-12 weeks | for verified buyers |
Specifications
| Mast type | Single track mast to Booster mast (see variants) |
|---|---|
| Section | Fabricated latticemade to order: Rolled beam / Tubular |
| Height | 8 mmade to order: 9.5 m / 11.5 m |
| Steel grade | Fe 410made to order: Fe 490 |
| Galvanising | Hot-dip 610 g/m2 |
| Mast bending moment | Per RDSO |
| Foundation | Pile |
| Cantilever | Tubular, galvanised |
| Registration arm | Included |
| Insulator | Polymer or porcelain |
| Setting distance | 2.8 mmade to order: 3.5 m |
| Fittings | Hot-dip galvanised |
| Welding | Certified welders |